Logo

NEWS

The PROMOTioN team of WP15 got back together for a live demonstration of gas-insulated HVDC grid protection systems on Thursday the 21st January 2021....

Read more

A full-scale prototype of the ABB hybrid HVDC circuit breaker was successfully tested in the independent KEMA Laboratories as part of the PROMOTioN...

Read more
Browse news by filtering your topic

On June 6, representatives of the Belgian, Danish and German governments, as well as representatives of the European wind energy industry signed a...

Read more

Deliverable 3.2 was released officially at the end of March. It is part of Work Package 3 “Wind Turbine – Converter Interaction”, which has main...

Read more

On April 13th, 2017, the German Federal Network Agency (Bundesnetzagentur) announced the results of the first auction for offshore wind projects. ...

Read more

TenneT TSO B.V. (Netherlands), Energinet.dk (Denmark) and TenneT TSO GmbH (Germany) signed a trilateral agreement on March 23rd 2017 for the...

Read more

In June 2016, the ten energy ministers of the Netherlands, Germany, Denmark, Sweden, Norway, Ireland, France, Luxembourg, Belgium and the United...

Read more

The newly released deliverable 1.4 of Work Package 1 has the purpose to provide relevant scenarios for potential installed wind capacities in the...

Read more

On 17 February 2017, WP5 leader DNV GL organised a TSO-workshop on HVDC grids and the respective role of DC circuit breakers. The objective of the...

Read more

Meshed high-voltage, direct current (HVDC) network technology is a potential candidate for the future electrical power infrastructure required to...

Read more

WindEurope today published the latest expansion figures for offshore wind energy in 2016: Europe installed 1.6 GW of new offshore wind energy in 2016...

Read more

This deliverable provides a fault stress analysis of HVDC circuit breakers within Work Package 5, which looks at the test environment of HVDC circuit...

Read more

The Danish transmission systems network operator Energienet.dk, together with National Grid Viking Ltd. (UK), issue €1.3 billion tender for Viking...

Read more

This Deliverable 1.5 of the PROMOTioN project contains definitions of which requirements are quantifiable and presents a list of the quantified...

Read more