Logo

NEWS

A full-scale prototype of the ABB hybrid HVDC circuit breaker was successfully tested in the independent KEMA Laboratories as part of the PROMOTioN...

Read more

Power system stability depends more and more on grid-connected power converters. Especially in converter-dominated and purely converter-based grids,...

Read more
Browse news by filtering your topic

Meshed high-voltage, direct current (HVDC) network technology is a potential candidate for the future electrical power infrastructure required to...

Read more

WindEurope today published the latest expansion figures for offshore wind energy in 2016: Europe installed 1.6 GW of new offshore wind energy in 2016...

Read more

This deliverable provides a fault stress analysis of HVDC circuit breakers within Work Package 5, which looks at the test environment of HVDC circuit...

Read more

The Danish transmission systems network operator Energienet.dk, together with National Grid Viking Ltd. (UK), issue €1.3 billion tender for Viking...

Read more

This Deliverable 1.5 of the PROMOTioN project contains definitions of which requirements are quantifiable and presents a list of the quantified...

Read more

Deliverable 1.2 (D1.2) is one of the outputs of PROMOTioN Work Package 1 (WP1), which is a horizontal WP that covers the whole project and has the...

Read more

In this deliverable, a set of requirements for the DRU (Diode Rectifier Unit) connected offshore wind farm is given as a basis for the control and...

Read more

PROMOTioN strongly depends on experience and input from various stakeholders, such as policymakers, industry and academic and research institutions.

Read more

In December, the first two deliverables of Work Package 6 (HVDC circuit breaker performance characterization) were completed.

Read more

Within the course of task 1.3 of the PROMOTioN project, the project consortium received valuable feedback from external stakeholders on their...

Read more

On November 30th, the European Commission presented its new energy strategy with the Energy Winter Package titled "Clean Energy for All Europeans"....

Read more

This first deliverable of Work Package 5 looking at the test environment of HVDC circuit breakers targets HVDC network fault analysis.

Read more